A capacity label on an unga mill is easy to misread. A "100T" plant is rated on raw grain entering the line, not on bags of flour leaving it. We walk first-time buyers through that distinction before we discuss models, because sizing a line from the wrong number is the most expensive mistake in a new mill.
At Tehold International we supply unga mills as complete chains: cleaning, degerming, conditioning, premilling, roller milling, elevators and power control. The published ladder runs from 7T to 100T per day. In the sections below we set out what each tier ships, what is actually published about output, and how to size your first line against demand you can defend and finance over the first few seasons.
An unga mill is a cleaning-to-packing chain, not a lone grinder. Depending on the tier, it brings together a multi-functional maize cleaner, degerming machine, conditioning machine, premill, roller mills, loading elevators and a power control system. We configure the sequence so grain is cleaned and degermed before it reaches the rolls. Our unga mill line is specified as a package.
Clean grain is degermed, conditioned and premilled, then fed to roller mills that reduce it step by step. Elevators lift stock between floors and the power panel ties the stages together. Sifting separates the saleable fractions; on the 100T plant the published fine flour share is 75–80%, with germ, bran and fodder flour at 15–20%.
We size against the flour you can sell, not the biggest number in a catalogue. A line that outruns your local market sits idle and ties up capital; one that is too small turns away orders. Published tiers from 7T to 100T give you room to choose.
Degerming and conditioning protect the rolls and improve the finished product. On the larger tiers the published cleaning train uses vibration sieve, air separator and destoner to remove stones, dust, soil, metal and spoiled grain before milling.
Because we supply the chain as a package, you deal with one exporter for design, fabrication, shipment, installation and after-sales. That is simpler than buying loose machines from separate sources and hoping they line up.
Custom design covers capacity, machine layout to your godown, and different finished products. You can start smaller and add stages later; the published range includes 10T, 12T, 30T, 50T and 60T steps between the ends.
The published range covers 7T, 10T, 12T, 20T, 30T, 50T, 60T and 100T per day, plus 36T and 40T complete plants. The 20T design capacity is 900–1000 kg/h, stated as 20–24 t/24h. The 100T plant is rated at 100–120 t/24h.
The 20T line fits one full 20 ft container. The 100T plant ships in three 40 ft containers. For the other tiers the shipment plan is not published, and we will give it to you in writing once the configuration is fixed.
The 100T page publishes 75–80% fine maize flour and 15–20% germ, bran and fodder flour. Extraction rates for the other tiers are not published, so we will not extend that figure down the range.
The 20T line is listed at around 65 kW. For the 100T plant the page shows two conflicting totals, so we do not quote a single power figure for that tier. Ask us to confirm the electrical load for your chosen configuration in writing.
The 100T plant is specified for a workshop of 27 × 10 × 10.5 m. Building guidance for smaller tiers is published only in part; the 20T description notes a compact design and small godown requirement. Confirm exact dimensions for your tier with us.
The 100T plant has a published delivery of 75 working days after deposit. For other tiers the lead time is not published. Across the range we apply a minimum 12-month quality guarantee from the day you receive the machine.
Published tiers, shipment and the buyer they suit | |||
Tier | Published Figure | Shipment | Typical Buyer |
|---|---|---|---|
7T | Semi-auto by pneumatic fan | To be confirmed in writing | New or village-scale mill |
20T | 900–1000 kg/h, 20–24 t/24h | One full 20 ft container | First commercial plant |
100T | 100–120 t/24h | Three 40 ft containers | Large urban operation |
Our 7T maize mill runs semi-automatically by pneumatic fan. An A/B storage bin is split by steel sheet with a slide gate, a cyclone collects material and an airlock seals air while feeding evenly. It suits a buyer learning the trade.
The 20T is our best-selling roller maize mill and the usual first commercial step. It combines cleaning, degerming, conditioning, premill, roller mills, elevators and power control, and fits one 20 ft container. Its compact design keeps the godown small.
The 100T plant uses grade-one double-face roller mills, a high square sifter and a grade-one degermer, with automatic or semi-automatic packing. Platform design saves power and floor area. Our 100T maize mill plant page carries the published 75–80% fine flour figure.
Small tiers serve local flour demand, where buyers collect meal regularly and freshness matters more than long shelf life. A 7T or 10T line keeps the operation manageable.
A 12T or 20T line suits a town mill serving shops and nearby villages. It adds degerming and conditioning without the building demands of a large plant.
Larger operations supply urban distributors that need volume and consistent grades. The 100T configuration supports automatic or semi-automatic packing for that channel.
Some buyers grind grain for neighbouring farmers and take a fee rather than owning the flour. The cleaning stages matter here, because grain quality varies from delivery to delivery.
Sizing choice for a first mill | ||
Consideration | Start Small, Expand | Buy Large from Day One |
|---|---|---|
Capital tied up | Lower initial outlay | High outlay before demand is proven |
Market risk | Short run-in while you build sales | Idle capacity if demand lags |
Expansion path | Add stages within the published ladder | Few upgrades left to make |
Published example | 7T or 20T tier | 100T, three 40 ft containers |
Best fit | New buyer learning the trade | Established urban distributor |
Start with the kilograms of unga you can sell each day; that figure sets the unga mill tier, not the raw grain you can buy. Work back from that figure using a ratio you can defend. If you cannot state one, tell us and we will keep the figure open.
Look at the grain you will actually receive. Stone, dust and metal loads decide how much cleaning you need ahead of the rolls. The published 36T cleaning train uses vibration sieve, air separator and destoner.
Compare your supply with the published 20T figure of around 65 kW. Do not carry that number over to the 100T tier, where the page conflicts and we will not quote a single total.
Check floor area, beam height and access for containers. The 100T plant needs a 27 × 10 × 10.5 m workshop; the 20T is described as compact with a small godown requirement. Send us your drawing.
Agree whether a tier number means raw grain in or flour out. Put that definition, the shipment plan and the lead time into the order. It prevents two sides quoting different things.
First-order sizing worksheet | ||
Input You Provide | Why It Matters | Status |
|---|---|---|
Daily saleable flour | Sets the tier | You estimate |
Raw grain condition | Decides cleaning stages | Sample or delivery history |
Power at site | Limits motor load | Site survey |
Building and access | Sets layout | Your drawing |
Capacity definition | Prevents mismatch | Confirm in writing |
The 100T plant uses platform design to save power and working area, so the structure must be planned with the machine, not after it. For smaller tiers, floor level and headroom for elevators are the first checks.
Set the cleaner, degermer and roller mills on their marked positions, then align the bucket elevators and power panel. We send technicians for installation and training, including work in East Africa, and commission the line with a trial run.
Plan container handling, lifting access and a route for spares. Our Kenya warehouse holds back-up parts and supports future expansion design and reconstruction work. Regular client visits are part of the after-sales plan, subject to force majeure.
Compare tiers on published capacity, shipment and electrical load. Keep unstated figures as open questions rather than treating another buyer's number as yours. The 20T and 100T data above are the anchors we can stand behind.
We adapt capacity, layout to your godown size and the finished products you want to sell. What we will not do is promise extraction rates or building dimensions that the site has not published for your tier.
Send a maize sample and, if you have one, the flour you aim to match. A physical reference makes the degerming and sifting conversation concrete and gives us something to preserve as a retained sample.
Installation and training are part of the package, and a 12-month guarantee runs from the day the machine is received. Parts replaced for poor fabrication are covered; damage from improper operation is excluded. Spares come through the Nairobi route.
We supply unga mills as turnkey packages: design and solution giving, fabrication, export, installation and after-sales service. That means one point of contact from the first layout sketch to the first bag of flour. Our technicians have over 30 years in the field, we size custom layouts to your godown, and our East Africa presence includes technicians for installation and training. Spares sit in Nairobi, and we hold a minimum 12-month quality guarantee from the day the machine arrives. Ask us for the capacity basis in writing before you pay a deposit.
It is a raw-grain capacity of 100–120 t/24h on the published 100T page, not 100 tonnes of bagged flour. That page also states 75–80% fine maize flour. When you compare tiers, agree first whether the number describes grain entering the line or flour leaving it.
We start from the flour you can sell each day and work backward. A 7T or 20T line suits a new mill; the 20T fits one 20 ft container and is listed at 900–1000 kg/h. Larger tiers make sense once demand and building space are proven.
The 100T plant has a published delivery of 75 working days after deposit. Lead times for the other tiers are not published, so we give those to you in writing once the configuration is fixed. Plan container handling and site preparation alongside the order.
We do not quote one. The 100T page lists two conflicting total-power figures, so a single number would be misleading. For the 20T tier, around 65 kW is published. Ask us to confirm the electrical load for your exact configuration in writing.
Yes. We send technicians for installation and training, including work in East Africa, and keep back-up spares at our Nairobi warehouse. The guarantee runs for a minimum of 12 months from the day you receive the machine, covering inferior fabrication while excluding loss from improper operation.